Corded & cordless stick vacuums · Wet-dry floor washers · OEM from 200 units · TÜV Rheinland-audited production · replies inside 24 hours

CAPABILITY 02

Quality & compliance.

Inspections before shipment, documents before production, and a compliance file you can verify with the laboratory rather than trust on a logo. The checks your own QA team would run — run here, with the reports sent to you.

ProductionTÜV Rheinland auditedProduction audit documentation available
CertificatesCE · GS · EMC · RoHS · CBUN 38.3 + SDS on lithium models
Minimum orderFrom 200 units per modelMixed-model containers accepted
ResponseQuotation in 24 hoursFOB Ningbo · FOB Shanghai

THE FOUR GATES

A defect caught late
has already been paid for.

The purpose of four inspection gates is not paperwork. It is moving discovery upstream, to the point where a defect costs a rework instead of a customer. Every gate produces a record, and the records come to you.

GATE 01

Incoming material

Motors, cells, PCBA, housings and plastics checked against specification before assembly. Non-conforming material is rejected at the door rather than built into a unit.

GATE 02

In-line assembly

Function checks at sub-assembly: motor spin-up, suction seal, battery contact, gear switching. Failures are reworked off the line, not pushed along it.

GATE 03

AQL pre-shipment

AQL sampling on the finished batch — appearance, function, packaging and accessory completeness — against the confirmed specification sheet.

GATE 04

Loading inspection

The container is verified against the loading table in the PI: carton count, print, pallet plan if used, and the diagram confirmed unit for unit.

DOCUMENTS PER MARKET

What applies to
your destination.

A generic certificate bundle is worse than useless — it invites you to plan around a document that does not cover your market. So the compliance pack is assembled per destination, and every figure below is indexed on the certificates page with its standard and scope.

Documentation summary — Cliia floor-care programme
Product lineElectrical & safetyBattery transportFactory
Wired 500 W series
HJ-500C / 500E / 500EF
CE (LVD + EMC), GS, EMC, EMF, RoHS, CB; ETL for the US and CanadaNot applicable — no batteryTÜV Rheinland supplier audit on record
Cordless 100 W & 150 W
HJ-100B/BF/BL/BLF, HJ-150D/DF
CE, EMC, RoHS; CB report for national conversionUN 38.3 test summary + SDS pack per shipmentTÜV Rheinland supplier audit on record
Wet-dry floor washers
HJ-FW series
CE, GS, EMC, RoHS; CB report for national conversionUN 38.3 test summary + SDS pack per shipmentTÜV Rheinland supplier audit on record
Working principle

“Every quotation ships with its specification sheet, its carton plan, its document route and a validity date — so your side can verify before you commit a deposit.”

Cliia · QUALITY & COMPLIANCE TEAM

!

If we do not know

We say so in the reply. An unanswered parameter is marked “with the spec sheet” on the website and confirmed before production — never filled with a plausible number.

#

If a figure changes

You hear it before the order, not after. A specification that cannot hold in production is raised at quotation stage, when you can still choose a different platform.

If a document is missing

It is published as a gap on the compliance page. We would rather tell you UKCA is pending than let you build a UK launch plan around a logo.

NEED DOCUMENTS FIRST?

Ask for the compliance pack.

Tell us your destination market and the models on your shortlist. We return the documents that actually apply, with the issuing laboratory and report numbers so you can verify each one independently.

Reply inside 24 hours MOQ from 200 unitsMixed-model containers TÜV Rheinland-audited line
Price listWhatsAppCall