Incoming material
Motors, cells, PCBA, housings and plastics checked against specification before assembly. Non-conforming material is rejected at the door rather than built into a unit.
CAPABILITY 02
Inspections before shipment, documents before production, and a compliance file you can verify with the laboratory rather than trust on a logo. The checks your own QA team would run — run here, with the reports sent to you.
THE FOUR GATES
The purpose of four inspection gates is not paperwork. It is moving discovery upstream, to the point where a defect costs a rework instead of a customer. Every gate produces a record, and the records come to you.
Motors, cells, PCBA, housings and plastics checked against specification before assembly. Non-conforming material is rejected at the door rather than built into a unit.
Function checks at sub-assembly: motor spin-up, suction seal, battery contact, gear switching. Failures are reworked off the line, not pushed along it.
AQL sampling on the finished batch — appearance, function, packaging and accessory completeness — against the confirmed specification sheet.
The container is verified against the loading table in the PI: carton count, print, pallet plan if used, and the diagram confirmed unit for unit.
DOCUMENTS PER MARKET
A generic certificate bundle is worse than useless — it invites you to plan around a document that does not cover your market. So the compliance pack is assembled per destination, and every figure below is indexed on the certificates page with its standard and scope.
| Product line | Electrical & safety | Battery transport | Factory |
|---|---|---|---|
| Wired 500 W series HJ-500C / 500E / 500EF | CE (LVD + EMC), GS, EMC, EMF, RoHS, CB; ETL for the US and Canada | Not applicable — no battery | TÜV Rheinland supplier audit on record |
| Cordless 100 W & 150 W HJ-100B/BF/BL/BLF, HJ-150D/DF | CE, EMC, RoHS; CB report for national conversion | UN 38.3 test summary + SDS pack per shipment | TÜV Rheinland supplier audit on record |
| Wet-dry floor washers HJ-FW series | CE, GS, EMC, RoHS; CB report for national conversion | UN 38.3 test summary + SDS pack per shipment | TÜV Rheinland supplier audit on record |
“Every quotation ships with its specification sheet, its carton plan, its document route and a validity date — so your side can verify before you commit a deposit.”
Cliia · QUALITY & COMPLIANCE TEAM
We say so in the reply. An unanswered parameter is marked “with the spec sheet” on the website and confirmed before production — never filled with a plausible number.
You hear it before the order, not after. A specification that cannot hold in production is raised at quotation stage, when you can still choose a different platform.
It is published as a gap on the compliance page. We would rather tell you UKCA is pending than let you build a UK launch plan around a logo.
NEED DOCUMENTS FIRST?
Tell us your destination market and the models on your shortlist. We return the documents that actually apply, with the issuing laboratory and report numbers so you can verify each one independently.