Corded & cordless stick vacuums · Wet-dry floor washers · OEM from 200 units · TÜV Rheinland-audited production · replies inside 24 hours

CAPABILITY 03

Packing, loading
& delivery.

Carton dimensions and container counts are published on every model page, so landed-price planning starts before the first call rather than after the purchase order. This page explains the packing logic and the terms — and why the carton is the largest margin lever you control.

ProductionTÜV Rheinland auditedProduction audit documentation available
CertificatesCE · GS · EMC · RoHS · CBUN 38.3 + SDS on lithium models
Minimum orderFrom 200 units per modelMixed-model containers accepted
ResponseQuotation in 24 hoursFOB Ningbo · FOB Shanghai

PACKING SYSTEM

Two carton logics,
one catalogue.

Straight-tube models ship in four-piece cartons; folding-tube models in compact three-piece boxes. That single design choice moves up to 508 extra units into a 40-foot container — roughly 27% more sellable inventory on an identical freight invoice, before any conversation about unit price.

HJ-500E Corded Stick Vacuum · Electric Brush — working specifications
Motor / power500 W AC
Working suction15 kPa rated working suction
Power sourceCorded — 5 m power line
RuntimeContinuous (corded)
Dust cup / tanks0.8 L dust cup
Weight2.16 kg net / 3.13 kg gross
Unit box (mm)665 × 210 × 235 mm
Export carton705 × 561 × 375 mm · 4 units · 13.5 kg
Loading 20GP / 40GP / 40HQ800 / 1,704 / 1,904 units
MOQ200 units (OEM) · mixed-model containers accepted
HJ-500EF Corded Stick Vacuum · Folding Tube — working specifications
Motor / power500 W AC
Working suction15 kPa rated working suction
Power sourceCorded — 5 m power line
RuntimeContinuous (corded)
Dust cup / tanks0.8 L dust cup
Weight2.16 kg net / 2.9 kg gross
Unit box (mm)415 × 330 × 180 mm
Export carton430 × 345 × 590 mm · 3 units · 9.7 kg
Loading 20GP / 40GP / 40HQ1,044 / 2,196 / 2,412 units
MOQ200 units (OEM) · mixed-model containers accepted

Both models sit on the same 500 W electric-brush platform. The only difference is the folding tube — and 1,904 versus 2,412 units per 40HQ. Model the landed price both ways before you commit to a first order.

THE ARITHMETIC

Work it in this
order, every time.

Most importers negotiate unit price first, then discover the freight. Do it the other way round: the carton determines the units, the units determine the freight per unit, and only then does unit price matter.

01

Units per container

From the loading table for your actual mix — not for a single model in isolation. Folding cartons carry 508 more units per 40HQ than their straight-tube equivalents.

02

Freight per unit

Total freight and origin charges divided by units, never by cartons. This is the number that changes when the carton changes, and it dwarfs most unit-price negotiations.

03

Landed unit cost

FOB plus freight per unit plus the destination charges your clearing agent actually quotes. Use real carton dimensions, not an assumed CBM.

04

Retail price at margin

Only now set the retail figure. If the margin does not survive step three, the answer is a different carton or a different model — not a harder negotiation on unit price.

DELIVERY TERMS

FOB Ningbo or Shanghai,
planned around your season.

Lead time is roughly 15 working days outside peak season and about four weeks in the September–December peak, counted from confirmed specification and approved artwork — not from the first message. The date is written into the PI. We do not give verbal estimates the production calendar cannot hold.

FOB

Ningbo / Shanghai

Standard terms. EXW and CIF quotable on request. Every quotation states the Incoterm explicitly and is valid for 30 days.

T/T

Payment

T/T with the balance against shipping documents. L/C at sight and D/P arrangements can be discussed for established programmes. Terms appear in the PI, never agreed verbally.

MIX

Mixed containers

Standard practice. Corded, cordless and floor washers in one box plan against one freight invoice. Send the list; get back units, weights and the loading diagram.

Export carton for the Cliia floor-care programme

THREE THINGS THAT BREAK A LOADING PLAN

  • Colour-box dimensions changing late. A reinforced box for a heavier machine changes the carton count. Confirm the box structure before the PI.
  • Accessory kits added after the carton was specified. A kit occupies its own volume. Agree the kit contents in the same breath as the carton.
  • Palletisation at destination rather than origin. A pallet plan can reduce units per container by 8–12%. Decide where the pallet is built before you price the freight.

The loading table goes inside the PI. That makes it a contract term rather than a spreadsheet nobody opens at the port.

CONTAINER ARITHMETIC

Send the list. Get the loading plan.

A model list and quantities are enough. You get units per container across 20GP / 40GP / 40HQ, net and gross weights, the carton mix, a loading diagram and the landed-cost guidance to go with it.

Reply inside 24 hours MOQ from 200 unitsMixed-model containers TÜV Rheinland-audited line
Price listWhatsAppCall